At 7:20 on March 4, Richard drove his Mercedes across Robert’s lawn, crushing stones surrounding his brass rain gauge while driveway workers unloaded their equipment nearby.
Richard promised to restore the stones, explaining that workers needed driveway access. He indicated a pink stake, possibly installed by contractors during their visit the previous day.
Carrying groceries, Richard caught falling bananas and recalled his mother’s advice. Robert requested moving the Mercedes, explaining his malfunctioning mower needed repairs the following morning after mowing.
The vehicle prevented Robert from mowing properly. Richard suggested cutting elsewhere, then promised to ask about the stake. Robert measured eighteen inches inside his lawn, recording everything.
At 8:10 the following morning, Linda examined the contractor’s notice with Robert. Its weeklong schedule and diagram showed Richard’s driveway work ending precisely at the property boundary.
Robert mentioned fresh orange paint near the stake. Leaving breakfast unfinished, they investigated, measuring seven inches inside his property before deciding to contact contractors rather than confront Richard.
Calling the contractor’s office on speakerphone, Robert and Linda learned the crew’s markings remained exclusively on Richard’s driveway, with no additional workers authorized to mark their lawn.
Robert documented the contractor’s response before checking the clock. His mower repair appointment was twenty minutes away, but the machine remained inside his shed, forcing him to cancel.